Cisco grounding requirements
WebDec 2, 2003 · Cisco recommends to use the grounding holes on their equipment to connect a grounding lug. The nice thing is that these lugs are never in the box, according to Cisco 'the grounding lugs are not available from Cisco Systems; any electrical-connector vendor can provide this lug'. WebMar 2, 2024 · Ground lug and screws (provided with the access point) Yes. Wall Mount Bracket. Yes. Four M6 x 12–mm Hex-head Bolts. Yes. Crimping tool for ground lug, Panduit CT-720 with CD-720-1 die No. Four wall mounting screws. No. Four wall anchors (specified for all material) No
Cisco grounding requirements
Did you know?
WebFeb 11, 2024 · General power and grounding requirements are: Installation of the Cisco CRS 16-Slot Line Card Chassis Enhanced router must follow national and local electrical codes: In the United States—United States National Fire Protection Association (NFPA) 70 and United States National Electrical Code (NEC) WebApr 4, 2024 · Alternatively, you can ground the chassis by using a customer-supplied grounding cable that meets your local and national installation requirements. For U.S. installations, we recommend 6-AWG wire. Connect your grounding cable to the chassis with a grounding lug (provided in the switch accessory kit) and to the facility ground. Note
WebNov 2, 2007 · To attach the grounding wire to the grounding receptacle on the Cisco 10005 DC PEM, perform these steps: Step 1 Set the DC PEM power switch (or switches) to the Off position. Step 2 Turn all three … WebMay 22, 2013 · 05-22-2013 06:49 PM. No... grounding is only required on outdoor equipment, access points and or antennas. 05-23-2013 04:46 PM. No the grounding is …
WebFeb 12, 2024 · Attach the provided two hole ground lug to the chassis using M4x 8mm bolts and then to the central office (CO) or other interior ground system with number 6 AWG wire. The grounding connectors are on the right side of the chassis, and either one may be used. (See Figure 2-1.) Figure 2-1 Grounding Pad Locations (Catalyst 4849-10GE shown) … WebMar 17, 2024 · Cisco Catalyst 9500 Series High Performance switch with optional network module 1 (power supply and fan modules not shown) 8. Two M4.0 x 20mm Phillips pan-head screws (Black color) 2 . Product documentation and compliance document. 9 . Ground lug and two M4.0 x 8mm Phillips pan-head screws. 3 . Two 19-inch mounting brackets
WebFeb 11, 2024 · – AWG 18 (1 mm ) or larger wire for EN/IEC 60950-compliant chassis grounding For NEC-compliant grounding, an appropriate user-supplied ring terminal, with an inner diameter of 1/4 in. (5 to 7 mm) In addition, depending on the type of modules you plan to use, you might need the following equipment to connect a port to an external …
WebAug 17, 2024 · Grounding cable (6 AWG recommended), sized according to local and national installation requirements; the required length depends on the proximity of the switch to proper grounding facilities Crimping tool large enough to accommodate the girth of the lug Wire-stripping tool Unpacking and Inspecting the Switch raymond the bastard quotesWebMar 25, 2024 · For information on available PoE, PoE+, and Cisco UPOE/UPOE+ requirements, see these sections the Power Supply Modules. The 350 W and 715 W AC power supply modules are autoranging units that support input voltages from 100 through 240 VAC. ... Dual-hole ground lug and two screws (included in the DC power supply … raymond theater nashvilleWebJun 24, 2024 · Grounding lug—A two-hole grounding lug, which supports a 6 AWG size wire. Supplied as part of the standard accessory kit. Grounding screws—Two M4 x 8 mm (metric) pan-head screws. … simplify bracketsWebMar 17, 2024 · When installing or replacing the unit, the ground connection must always be made first and disconnected last. Statement 1046 Warning To reduce risk of electric shock or fire, installation of the equipment must comply with local and national electrical codes. Statement 1074 Warning raymond the butler citizen kaneWebJan 26, 2024 · 2 Use a screwdriver to remove the port cover and access the port. 3 Use a screwdriver to remove the port cover and access the port. Ports. Note: Different configurations are available. Not all ports or slots are present in all configurations. 1G SFP/ 10G SFP+ Ports (Uplinks) simplify boolean functionsWebMar 13, 2024 · 1. Throughput measured with 1500B User Datagram Protocol (UDP) traffic measured under ideal test conditions. 2. “Multiprotocol” refers to a traffic profile consisting primarily of TCP-based … raymondthecatmanWebFeb 15, 2024 · Make sure to follow any grounding requirements at your site. Step 1 Use the ground lug screw and the lug ring for a single-ground connection. Use the dual-ground adaptor and dual-hole lug for a dual … raymond the bastard